1 |
Data collection survey on road disaster prevention in Nepal |
JICA, Nippon Koei |
|
|
View
|
2 |
Feasibility Study of Rara Rajmarga Kusepatan Jajarkot (Byaulidhunga) Jumla (Imlicha Khola) Road Tunnel |
DoR, QRDC |
|
|
View
|
3 |
Pre-Feasibility of study Sunkoshi Tawa Diversion Multipurpose Project |
Department of Water Resource and Irrigation |
|
|
View
|
4 |
Detailed Feasibility Study of Navigation along Tamakoshi River |
Nepal Shipping Office |
|
|
View
|
5 |
Detailed Design and Construction Supervision of the Pilot Project for Baneshwor Intersection Improvement |
JICA, Nippon Koei |
|
|
View
|
6 |
Climate Change Vulnerability and Risk Assessment along Nagdhunga-Naubise-Mugling-Narayanghat Road Corridor and a Network Level Climate Change Vulnerability and Risk Mapping |
World Bank |
|
|
View
|
7 |
PMC for Road Safety Management under SRCTIP |
DoR/ DCID/ SRCTIP/ WB |
|
|
View
|
8 |
Engineering Design, IEE, TIP Risk Management Plan Development, RAP Development and Implementation Supervision and Construction Supervision for Dhankhola Lamahi Pilot Road Project (40 km) |
MCC |
|
|
View
|
9 |
Technical, Financial and Organizational/ Institutional Enhancement of Water Supply Projects |
Town Development Fund |
|
|
View
|
10 |
Construction Management and Supervision of Tamakoshi V Hydroelectric Project |
Tamakoshi Jal Vidhyut Company Limited |
|
|
View
|
11 |
Preparation of DPR of Impounding Reservoir for water supply at Mahadev Khola, Bhaktapur |
DWSS |
|
|
View
|
12 |
Design and Supervision Consultant (DSC), Shuklagandaki |
Shuklagandaki Municipality |
|
|
View
|
13 |
Feasibility Study, Detailed Engineering Design and Preparation of Tender Documents of Daraundi HEP (8.85 MW), Gorkha |
Manakamana Daraundi Hydropower Co. Ltd. |
|
|
View
|
14 |
Initial Environmental Examination (IEE) Study of Bajhang-West Seti- New Aattariya (West Seti Corridor) 400kV Transmission Line Project |
Rastriya Prasaran Grid Company Limited |
|
|
View
|
15 |
Construction Supervision of Nagdhunga Naubise Mugling Road Project |
DoR/ DCID/ SRCTIP/ WB |
|
|
View
|
16 |
Pre-Feasibility, Feasibility study and Preparation of Detail project Report of East Urban Corridor (EUC) Development Project |
RUDP, DUDBC |
|
|
View
|
17 |
Due Diligence Review, Design, Cost Estimate, Bid Evaluation and Construction Supervision of Intelligent Traffic Signal System |
DoR |
|
|
View
|
18 |
Feasibility and IEE Study of HIMA (6.7 MW) HEP |
DoED |
|
|
View
|
19 |
Technical Bill Verification of Likhu II |
Global Hydro Associates |
|
|
View
|
20 |
Detailed Project Report of Rural Connectivity Improvement Project (RCIP) Phase-2; ADB Loan No: 3620; Package No: DoLI/RCIP/DPR-04/2019, Province No-5 |
Department of Local Infrastructure |
|
|
View
|
21 |
DoR Central Building Minbhawan Design and Supervision |
DoR |
|
|
View
|
22 |
Regional Urban Development Project (RUDP) in Province -7 |
DUDBC |
|
|
View
|
23 |
Rasuwagadhi Hydroelectric Project |
SMEC Pty Ltd. |
|
|
View
|
24 |
Naghdhunga Tunnel Construction Project |
Naghdhunga Tunnel Construction Project |
|
|
View
|
25 |
ITECO Nepal - RIMC JV in association with TMS |
Nepal Electricity Authority |
|
|
View
|
26 |
South Asia Sub-Regional Economic Cooperation (SASEC) Power System Project; Safeguard Implementation and Monitoring work |
Nepal Electricity Authority |
|
|
View
|
27 |
Western Region Design Construction and Management Consultant for UWSSP |
Department of Water supply and Sanitation |
|
|
View
|