iteco@mos.com.np +977-1-4106776
  • HOME
  • ABOUT
    • About Us
    • Background
    • Company Profile
    • Organization

    • Biography
  • SERVICES
  • PROJECTS
    • Ongoing
    • Completed
  • NOTICES
    • Holidays List
    • Extenstion Numbers
  • CONTACT US
    • Log In

WELCOME TO

ITECO NEPAL

WE ARE SERVING

FOR THE BETTER

FUTURE

ABOUT US

ITECO Nepal (P) Ltd. is an engineering consulting company founded in 3rd May,1987 by the group of experienced professionals. Within a short period, ITECO Nepal has grown into one of the most reputed companies of Nepal. Today it’s activities cover a whole range of services including engineering design and construction, project planning and preparation, institutional buildup, technical assistance and training, advisory services and all aspects of project implementation. ITECO Nepal has an efficient operational system backed by devoted experts with adequate experience. The competence of our staff, our commitment to high standards and our proven ability to tackle complex assignments even under difficult circumstances have been well appreciated by our clients both inside and outside Nepal. ITECO Nepal is leading engineering consulting company in Nepal providing diverse range of services in engineering sector through latest and cutting edge technology. ITECO Nepal has a wealth of experience in the field of project management, transportation, hydro-power, water supply and sanitation, sewerage management, rural and urban infrastructure development, water resources development, social and environment sectors.
OUR SERVICES

INFRASTRUCTURE

Infrastructure and physical developments, rehabilitation, reconstruction, maintenance, improvement and upgrading, landscape and site development and formulation of development plans.

TRANSPORTATION

Aspects of development of conventional road network, bridges, suspension bridges, and non conventional forms of transport such as ropeway transport and inland water transport, relevant to Nepal.

WATER RESOURCES

Various aspects of development of gravity and pumped irrigation schemes, exploitation of surface and ground water potentials for water supply (small town water supply and sanitation), basin studies and water storage studies.

ENERGY

Aspects of generation and distribution of energy with special emphasis on the small and mini hydel sectors, and aspects of introducing portable Pelt on turbines for village electrification.

SURVEY AND MAPPING

Cutting-edge survey and mapping solutions, revolutionizing data collection and analysis, ensuring accuracy and efficiency in decision-making processes for the country's infrastructure development.

HYDROPOWER

Aspects such as feasibility study,detailed design and construction supervision of hydropower projects.

Show All

Latest News

Feasibility and IEE Study

  • Aug-29-2023

Consulting Services for Feasibility Study and Initial Environmental Examination

Traffic Signal System

  • Aug-29-2023

Review, Design, Cost Estimate, Bid Evaluation and Construction Supervision

Feasibility/Details Project Report

  • Aug-29-2023

Pre-Feasibility, Feasibility study and Preparation of Detail Project Report

Construction Supervision

  • Aug-29-2023

Construction Supervision of Nagdhunga Naubise Mungling Road Project

  • Sun
  • Mon
  • Tue
  • Wed
  • Thu
  • Fri
  • Sat
    DISCOVER OUR GALLERY

    Cinque Terre Northern Lights Mountains Cinque Terre Forest Northern Lights Mountains Cinque Terre Forest Northern Lights Mountains
    OUR PROJECTS

    Preparation of Detail Project Report for Lamiraha Multipurpose Dam at Sainamaina, Rupandehi, 132 m long and 23 m high Concrete Faced Rockfill Dam (CFRD)
    Starting Date : November 2020
    Completion Date: March 2021
    Detail Design and Construction Supervision of Nagdhunga Tunnel Project (2.45 Km) JICA funded
    Starting Date : February 2017
    Completion Date: Ongoing
    Road Sector Development Project World Bank Grant No. H 629:NP Phase I: Feasibility Study, and Detail Engineering Design Phase II: Construction Supervision
    Starting Date : May 2010
    Completion Date: June 2015
    Daraudi River Bridge (during construction) in Dhodeni, Gorkha. The 134-meter long bridge built under JICA's Grant Aid connect the epicenter Saurapani on the other side of the Daraudi River. Bridge Construction along BARAKILO-BARPAK Road Project
    Starting Date : November 2016
    Completion Date: July 2018
    Safeguards Implementation and Monitoring works of South Asia Sub-Regional Economic Cooperation, Power System Expansion Project ADB funded.
    Starting Date : November 2017
    Completion Date: Ongoing
    Preliminary Tunnel Engineering Design and Preparation of General Arrangement Drawings of Posta Bahadur Bogati Tunnel Project (Bhimphedi Kulekhani Tunnel Construction Project)- 3.20 km
    Starting Date : February 2020
    Completion Date: July 2020
    Show All
    OUR CLIENTS

    • Keep Exploring
    • Home
    • About Us
    • Services
    • Contact Us
    • Contact Us
    • ITECO Nepal (P) Ltd.
    • P.O. Box 2147,90,
    • Panchakanya Marga, Minbhawan
    • Naya Baneshwor, Kathmandu, Nepal
    • Phone : +977-1-4106776
    • E-mail : iteco@mos.com.np
    • Send Us a Message
    © ITECO Nepal (P) Ltd. All Rights Reserved.